This topic outlines the process to automatically number all cables in the drawing.
NOTE: THIS FUNCTION RENUMBERS ALL CABLES IN THE DRAWING REGARDLESS OF WHETHER THE CABLE HAS A NUMBER.
The number format is determined by the Signal Type.
The Cable Number Prefix field will be prepended to the Next Number field.
For example let's assume that the Signal Type is AUD and the Cable Number Prefix field data is AUD-.
Further that the Next Number field is 1050.
The next AUD cable (where AUD is the signal type of the FROM port) would receive the number "AUD-1050".
Before Adding Cable Numbers After Adding Cable Numbers
•You have created a project.
•You have created a drawing.
•You have added at least two functional blocks to the drawing.
•You have added cables to the drawing.
Cable > Number All
1.Open the drawing.
2.Click Cables > Number All.
3.Done.